An Evaluation of the Role of Port Administration in Comprehensive Planning and Management of the Canadian Coast?The Example of Vancouver
The current institutional approach adopted to plan and regulate developments in Canada's major ports is assessed. To determine the effectiveness of the Canadian approach,...

Implementation of the North Fraser Harbour Environmental Management Plan
Since 1913, The North Fraser Harbour Commission (NFHC) has been responsible for administering the Port of North Fraser. This responsibility is especially challenging because the port is...

Pre-Operational Considerations for Marine Finfish Aquaculture: Site Selection and Allocation in British Columbia
Marine fish farming is a new component in the complex mixture of coastal resource uses in British Columbia. To ensure that the marine finfish aquaculture industry develops within an environmentally...

Public Access Evolution Long Beach, California, Coastline
Historic Long Beach was built around the beachfront. Public access to this popular coastal resort was provided in many ways. The downtown has undergone a renaissance of that former regional...

Remedial Planning for the Former EXPO 86 Site
This paper describes the site characterization and remedial action planning effort that is being undertaken at the former EXPO 86 site in downtown Vancouver, B.C. The 200 acre site on...

Autothermal Thermophilic Aerobic Digestion: A Two-Year Appraisal of Canadian Facilities
Full scale, autothermal thermophilic aerobic digestion (ATAD) facilities were constructed or upgraded in 1988 to demonstrate high temperature aerobic digestion of municipal sludges at...

Geotechnical Aspects of the Underground Excavations at the Kemano Completion Project
The Kemano Completion Project is the addition of four generators of 540 MW installed capacity to an existing eight-unit underground hydroelectric generating station owned and operated...

Heavy Metal Transport in the Columbia River, British Columbia
Data on the total forms of selected metals were used to assess their concentrations at two sampling sites on the Canadian Columbia River from 1984 to 1989. Cadmium, the response variable...

Imperial Irrigation District Water Conservation
Imperial Irrigation District (IID) and Metropolitan Water District (MWD) have entered into a Water Conservation Agreement to conserve 106, 110 acre-feet (1.31 ? 108...

Preliminary Earthquake Mitigation Planning to Improve Watermain Performance in Vancouver, B.C.
City of Vancouver's water transmission and distribution system is vulnerable to over 1,000 pipe leaks or main breaks from a probable large earthquake (about 7.5 M). Cast iron...

A Real-Time Traffic Diversion Model: A Conceptual Approach
The development of a real-time traffic diversion control system for integrated freeway and arterial networks, as part of the most currently envisioned Intelligent Vehicle/Highway System...

Environmental Wave Barriers for Small Craft Harbors
This paper describes the history and development of the environmental wave barrier and the current planning and design being undertaken for a major expansion of the small boat harbor at...

Twin Pipeline Crossing of the Fraser River
A new creek water supply was developed for the communities of Mission and Matsqui, British Columbia, Canada, in the early eighties. Over 60 kilometres of 450 mm to 900 mm diameter ductile...

Validation of a Traffic Modeling System for Detour Planning
The Downtown Seattle Transit Project (DSTP) was initiated as an effort to relieve existing traffic congestion in downtown Seattle. It consists primarily of a 1.3-mile electric-bus tunnel...

Upgrading of the Orange Cove Irrigation District Water Distribution System
The Orange Cove Irrigation District covers about 28,000 Acres in the Central Valley of California. It is supplied from the Friant-Kern Canal. A semi-closed low pressure pipeline system...

Landslides and Cherry Trees -- Upgrading the Dalles Irrigation District
The Dalles Irrigation District recently began the process of applying for a federal loan to finance upgrading of the District's distribution system. The process included preparation...

Water Quality Criteria for Cyanide in the Similkameen River, British Columbia
The toxicological and environmental significance of the major cyanide compounds is discussed. Data from earlier bioassays studies of cyanide are summarised and the ranges of median lethal...

Iona Outfall Plume Characterization Study
Field studies were conducted in August 1988 to verify the performance of the new deep sea outfall for the Greater Vancouver Regional District (GVRD) Iona Island Sewerage Treatment Plant...

People Movers Move Downtown
Although the people mover has become a common sight at major airports in the U.S. and abroad, the sleek high tech vehicles have yet to establish themselves as a cost effective mode of...

Orchestral Maneuvers
Symphony Towers is an H-shaped superstructure that straddles Symphony Hall in downtown San Diego. The $143 million project is a 34-story office building to the south of the hall and a...

 

 

 

 

Return to search